Foundations, walls, slabs and roofs.

Florin and his crew build the part of a house that everything else stands on: formwork and rebar, brick walls, concrete slabs, roof timber and tiles. Then, if you want, the rest of the house too.

Rebar cages for the foundation, laid out on the plot
One house, from the first rebar cage to the roof tiles

Everything it takes to get from plan to keys.

One builder who answers the phone, instead of ten who point at each other.

Recent work.

Real photos from real jobs: foundations and structures, homes, bathrooms, pergolas and facades. The best ones come first.

See all projects

A family home in Felnac.

White render, a dark tile roof and a paved yard where bare earth used to be. The same plot, and a different place.

Drone view of the finished house and yard

From above.

The finished house and yard, filmed by drone.

The finished family house with white render, a dark tile roof and an iron gate

From the street.

White render, a dark tile roof, a black stone plinth and an iron gate.

Grey windows and door, white render and a dark stone plinth

Details that last.

Grey-framed windows and doors, a dark stone plinth, clean lines at every corner.

Fresh lawn and paved path beside the house

Green again.

Lawn, planted beds and paved paths all the way round the house.

Bright living room with a green sofa and a big window

Rooms made to live in.

Bright walls, big windows and room to spread out.

The house roof and garden in the evening sun

Home, at golden hour.

The roof, the garden and the evening sun. This is what we build.

More photos.

The finished house with white render and a dark roof, seen from the garden
The house from the garden
Paved path along the side of the house
The paved side path
Planted garden beds beside the paved yard
Garden beds
Glass doors opening onto the garden
Glass doors to the garden
Long side wall of the house with the dark roof
The long side wall
Paved yard with a metal drainage channel and young trees
Paving and drainage channel
Bright room with a large window
A bright room
Room with built-in wardrobes
Built-in wardrobes
Big room with tall windows, a light tiled floor and potted plants
The big room, with tall windows
Finished room with a white door and the dark glass entrance door
A finished room by the entrance
Hall with light laminate floor and two doorways
The hall and its doorways
Room with a wooden ladder up to the attic and a doorway to the big room
Ladder up to the attic room
The wall along the street being rendered, next to the gate
The street wall, being rendered

The house, on paper.

The facts behind the photos.

Type
Family home with workshop
Where
Felnac, Arad
Finished
2026
Size
1,000+ m²
Rooms
3 bedrooms, 2 living rooms, 2 kitchens, 3 bathrooms, workshop
Time to build
1 year

Inside and around

  • Big workshop
  • Big living room
  • Smaller living room with TV
  • 2 kitchens
  • 2 bathrooms with shower
  • Workshop bathroom (toilet and sink)
  • Attic room
  • 2 bedrooms
  • 1 separate bedroom
  • Underground storage
  • Dogs' shed
  • Shed
  • Terrace
  • Courtyard
  • Front yard
  • Paved paths and yard
  • 2 storage attics

Everything above this line, you can see. Everything below it, you have to trust.

Finished floor level

So here is the same house again, going down. These are Florin's own site photos, taken before each layer was covered.

The same house, layer by layer

Plastered walls and windows, ready for finishing

Behind the paint.

Smooth plaster, windows in, insulation at the base. The shell is done and the finishing begins.

Corner of aerated concrete block walls with a rebar cage standing for a concrete column

Walls and rebar.

Aerated concrete blocks laid course by course, with rebar cages standing in the corners for the concrete columns, and a ceramic lintel over every opening.

  • Aerated concrete block walls on the footing, with rebar cages in the corners
    First courses on the footing
  • Doorway in an aerated concrete wall, with a ceramic lintel above
    A doorway and its lintel
  • Wall opening with a ceramic lintel, seen from the concrete floor
    Walls up to lintel height
Steel posts welded and painted, laid out on a concrete slab

Holding it up.

Steel posts welded and painted before they go up. Work done right on the ground saves trouble in the air.

Foundation trench with formwork and reinforcement

Under everything.

Formwork and rebar set before any concrete: in the foundation trench, and again on top of the walls for the ring beam. The parts nobody sees, and everything depends on.

  • Timber formwork for the ring beam on top of the walls, with pallets of aerated concrete blocks
    Formwork for the ring beam, on top of the walls
  • Steel props holding the timber formwork above a room, before the concrete pour
    Props under the formwork, before the pour
  • Foundation trench with timber formwork boards and a steel reinforcement ladder along its side
    The trench, with formwork and reinforcement
Excavator clearing the site, with new roof tiles on pallets

Before the first trench.

The excavator moves in, the old makes way, and the new roof tiles are already waiting on pallets.

The family house before construction, with dogs resting by the wall

What stood here.

An old family house, a vine over the door and a yard full of memories. Not much to look at, and everything to build on.

  • Shaded yard under grapevines with the family dog
    The yard under the vine
  • The old barn with a red wooden gable
    The old barn
  • The old yard under the first snow
    First snow
  • The old wooden front door under grapevines
    The old entrance

And one level lower.

Florin also builds rooms under the ground: reinforced concrete, waterproofed, drained and reached by stairs. Sizes are made to measure.

See underground storage
Example section drawing of an underground storage room: 6 metres wide, 2.4 metres clear height, with stairs, two ventilation pipes, a waterproof membrane and a drain 6.00 m 2.40 m ±0.00 Ventilation Reinforced concrete Storage, 18 m² Stairs Membrane and drain all round
Example section through an underground storage room, simplified: 6 × 3 m, 18 m², 2.4 m clear height. Every room is sized to the plot.

How we build.

Four steps, one person to call.

  1. Listen

    We learn how you live: who cooks, who works from home, where the kids do homework.

  2. Plan

    Drawings, permits and a clear written budget before the first shovel.

  3. Build

    Our crew on site, regular updates and no surprises on the bill.

  4. Hand over

    A walk-through, the keys and a phone number that still works after.

Florin, the builder.

Florin has worked in construction for 20 years. Based in Felnac, he builds across Romania, from roofs to underground storage, brand-new homes to refurbishments. The family home above is one of his recent builds.

“We were amazed at how fast Florin works, and the quality is excellent. He was helpful at every step, and we love living in the house he built for us.”
The family who live in the featured home, Felnac

Good questions.

Where do you work?

Florin is based in Felnac and works across Romania.

How long does a house take?

It depends on size, site and finishes. After seeing your plans Florin gives you a written timeline, not a guess.

Do you handle permits and paperwork?

Yes. Planning, permits and paperwork are part of the job, so you deal with one person.

Can I see more of your work?

Yes. Browse real photos from finished and ongoing jobs on the Projects page, or message Florin on WhatsApp and he will send more.

How do I get a price?

Call or WhatsApp Florin with your plot and plan. He will follow up with a clear written quote.

Let’s build yours.

Message Florin on WhatsApp. Send your plot, your plan or a few photos, and he answers directly.

Based in Felnac, working across Romania.

WhatsApp Call